| | | |
|
|
|
|
|
About 200 pounds of material removed - and 600 to go! - Nigel Bennett (nbennett) Viewed: 1585 times.
|
Mike preparing the mud ring for welding - Nigel Bennett (nbennett) Viewed: 1642 times.
|
Firebox crown sheet seam - Nigel Bennett (nbennett) Viewed: 1591 times.
|
Front tube sheet - Nigel Bennett (nbennett) Viewed: 1618 times.
|
| | | |
| | | |
|
|
|
|
|
Cutting a super heater flue - Nigel Bennett (nbennett) Viewed: 1576 times.
|
All cut and ready for painting - Nigel Bennett (nbennett) Viewed: 1526 times.
|
Drilling the rivet holes - Very carefully !! - Nigel Bennett (nbennett) Viewed: 1641 times.
|
Fireman's side looking back to inner firebox - Nigel Bennett (nbennett) Viewed: 1669 times.
|
| | | |
| | | |
|
|
|
|
|
Fireman's side looking forward to front tube sheet - Nigel Bennett (nbennett) Viewed: 1569 times.
|
View forward showing tube sheet braces and dry pipe - Nigel Bennett (nbennett) Viewed: 1556 times.
|
Boiler barrel clean and open again - Nigel Bennett (nbennett) Viewed: 1530 times.
|
All this came out of the boiler - Nigel Bennett (nbennett) Viewed: 1569 times.
|
| | | |
| | | |
|
|
|
|
|
Looking more like a locomtive again - Nigel Bennett (nbennett) Viewed: 1541 times.
|
The back sheet now clean and ready for inspection - Nigel Bennett (nbennett) Viewed: 1536 times.
|
Progress in testing the stays. Eash one marked has been cleaned and tested - Nigel Bennett (nbennett) Viewed: 1535 times.
|
Making good the rivet holes for the patch - Nigel Bennett (nbennett) Viewed: 1545 times.
|
| | | |
| | | |
|
|
|
|
|
Preparing the tube sheet to receive new tubes - Nigel Bennett (nbennett) Viewed: 1536 times.
|
1630 is moved out of the shop April 2012 - Nigel Bennett (nbennett) Viewed: 2030 times.
|
Throttle body in situ (but rigged ready to lift) - Nigel Bennett (nbennett) Viewed: 1615 times.
|
Lifting out the throttle body - Nigel Bennett (nbennett) Viewed: 1945 times.
|
| | | |